Pv backfed breaker to be 70a for load side connection to bus.
Derating sub panel for solar.
The inverter breaker in the sub panel is the breaker to use in the calculations.
Use the derating factor to account for such factors as soiling of the panels wiring losses shading snow cover aging and so on.
On this project i was hired as a sub contractor to install the electrical panel for a larger well known solar company.
An sma sunny boy 2500hf and an sma sunny boy 5000.
This was the first time i ever replaced a electrical panel directly next to a window.
Pvwatts applies derate factors to determine the amount of ac power that will flow into the grid from the solar array accounting for many of the environmental characteristics of the site as well as system design and chosen components.
John smith is a homeowner in california looking to reduce his electric bill by going solar and he decided to call an installation company that he found on the internet.
A new solar pv system to be installed.
The next day a rep from xyz solar came out to his house and after looking at his electric bill told john that he would need an 8 5kw pv system to offset 100 of his past 12 month usage.
Main panel has 200a bus and breaker.
Consider that we are using two string inverters.
This panel had to be upgraded due to the large 13kw ground mount solar pv system being installed.
The result is that you can shave off a few extra amps before you connect the sub panel output to the main panel board.
For example picture a 200a main breaker box feeding a 125a sub panel through a 100a breaker with a 100a main breaker in the 125a sub panel.
The photovoltaic pv derating factor is a scaling factor that homer applies to the pv array power output to account for reduced output in real world operating conditions compared to the conditions under which the pv panel was rated.